Linofog® Fix is a polyurethane based, 2-component material to be mixed with fine grain aggregate. Linofog® Fix is developed to enable quick repairs with short open time and quick drying time of approx 2-3 hours. Linofog® Fix is applied in thicknesses between 0-40 mm. Preferable, Linofog® Fix should be used as repair material for smaller damages and unlevel nesses. Please find Linofog® Fix chemical resistance and tests according to the below figures.

 

Acid: 10 % sulphuric acid
50 % phosphoric acid
50 % chromic acid
Animal: fat
protein
blood
Alkali: 1 % caustic soda
1 % ammonia
Vegetable: fat
protein
sugar
Salt: NaCl
Na2CO9
10 % NaHCO9
Oil: crude oil
light oil
lamp oil
machine oil (mineral)

 

The following tests have been run at the National Testing Institute in Japan (JIS)

 

Surface material Tensile strength N/mm2 Elasticity module N/mm2 Max flexibility %
Linofog® Fix 5,3 29,8 18
Epoxi  58,3 2,9 2,2

 

JIS sample size: 13 x 13 x 150 mm, span 100 mm, test speed 3 mm/min.

 

Adhesiveness (N/mra2)

 

Surface material Primer Steel Stainless steel Aluminium Concrete
Linofog® Fix no
yes
3,8
6,6
4,3
7,0
2,9
4,1
1,7
2,4
Epoxi no
yes
3,1
5,0
4,2
6,8
1,6
6,2
1,9
2,7

 

JIS K 6850 extension and scratch test
Abrasion test:

 

Surface material Revolutions Wear result (abrasion)
Linofog® Fix 400
1000
1500
low wear
0,1 mm
0,2 mm
Epoxi 400 2 mm heat deformation from the beginning

 

Laying instructions
1. Make sure that the surface is free from dust and moisture. 
2. Apply Linoprimer evenly over the surface. 
3. Let the Linoprimer dry for approx 3 hours (based on temperatures + 14-18 °C) 
4. Mix 2,5 kg aggregate with 1,75 kg Linofog® Fix Base. Add the 0,75 kg hardener, mix to a smooth mixture (empty the hardener can thoroughly). 
5. Apply the mixture with a hand trowel. 
6. Let it harden for approx 2 hours (based on temperatures between + 14 -18 °C) 
7. When more aesthetic demands are required, grind the joint with a fine grain sandpaper, first after 3-4 hours after application (based on temperatures between +14-18 °C)

 

Consumption
1 kg ready mixed material is enough for approx 1m2 and 1,8mm thickness.

 

Packaging
Linofog® Fix base 1,75 kg, Linofog® Fix hardener 0,75 kg, Linofog® Fix aggregate 2,5 kg = 1 set/5 kg/3 lit = 1 m2 and 9 mm thickness.

 

up